پایان نامه های اخیر دانشگاه آلبرتا در گرایش مهندسی و مدیریت ساخت - با تشکر از خانم مهندس فریبا حمیدی که این فهرست را تهیه کرده اند. |
No |
Thesis title |
Author |
graduation |
Year of research |
1 |
Automated Planning and Scheduling for Industrial Construction Processes |
Hu, Di |
Doctoral |
3/19/2013 |
2 |
A simulation-based framework for as-built documentation of construction progress and product information |
Moghani, Elmira |
Doctoral |
1/30/2013 |
3 |
A Framework for ergonomic assessment of residential construction tasks |
Inyang, Ndukeabasi |
Doctoral |
1/28/2013 |
4 |
Design Evaluation and Optimization of School Buildings Using Artificial Intelligent Approaches |
Alyari Tabrizi, Eilnaz |
Master's |
1/23/2013 |
5 |
Oil sands mine planning and waste management using goal programming |
Ben-Awuah, Eugene |
Doctoral |
11/29/2012 |
6 |
Investigation of the Adaptation of WorkFace Planning at the Organization and Project Levels and the Development of a Mathematical Model to Quantitatively Evaluate the Effectiveness of WorkFace Planning |
Peng, Jing |
Master's |
9/26/2012 |
7 |
A Comparative Analysis on Sewer Structural Condition Grading Systems Using Four Sewer Condition Assessment Protocols |
Khazraeializadeh,Soroush |
Master's |
9/19/2012 |
8 |
Modeling Reclamation Earthwork Operations Using Special Purpose Simulation Tool |
Sabha, Fayyad H |
Master's |
8/30/2012 |
9 |
A Semantic-Driven Framework for Facilitating Reusability and Interoperability of Construction Simulation Modeling |
Saba, Farzaneh |
Doctoral |
8/21/2012 |
10 |
Simulation Based Process Flow Improvement for Wood Framing Home Building Production Lines |
Shafai,Leila |
Master's |
7/25/2012 |
11 |
Intelligent Contractor Default Prediction Model for Surety Bonding in the Construction Industry |
Awad, Adel Ls |
Doctoral |
6/15/2012 |
12 |
Improving Dynamic Project Control in Tunnel Construction |
Xie, Hua |
Doctoral |
6/7/2012 |
13 |
Project Controls for Engineering Work in Practice |
Kostelyk, Jesse D |
Master's |
4/30/2012 |
14 |
An Integrated Simulation-based Planning Approach for Construction Projects |
Hong, Jangmi |
Master's |
3/20/2012 |
15 |
Integrated Approach for Older Adult Friendly Home Architectural Design |
Afifi, Mona |
Master's |
20-Mar-12 |
16 |
Managing Tunnelling Construction Risks |
Giel-Tucker, Kimoya Lee |
Master's |
1/31/2012 |
17 |
Improving the Efficiency, Productivity, and Cost-Effectiveness of Modular Design and Construction Processes |
van Mulligen, Calvin P |
Master's |
1/6/2012 |
18 |
An integrated real-time control system for structural steel fabrication projects |
Azimi, Reza |
Doctoral |
9/27/2011 |
19 |
Incorporating the effects of complex dynamic interactions in the construction decision making process |
Alvanchi, Amin |
Doctoral |
9/26/2011 |
20 |
Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework |
ElNimr, Amr |
Doctoral |
8/17/2011 |
21 |
Surface Profiling the Sanding Process of Dry Wall on Construction |
Alex, Dony Cherian |
Master's |
1/26/2011 |
22 |
A Positioning Technique Integrating Wireless Sensor Networks and Artificial Neural Networks for Critical Construction Resource Tracking |
Soleimanifar, Meimanat |
Master's |
9/28/2011 |
23 |
Hybrid decision support system for risk criticality assessment and risk analysis |
Abdelgawad, M.Abdelrahman |
Doctoral |
12/2/2010 |
24 |
Developing a Generic Resource Allocation Framework for Construction Simulation |
Taghaddos, Hosein |
Doctoral |
8/27/2010 |
25 |
A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities |
Elbarkouky, Mohamed |
Doctoral |
9/23/2010 |
26 |
An integrated approach toward lean for production homebuilders |
Yu, Haitao |
Doctoral |
8/12/2010 |
27 |
Enhancing risk identification workshops: an idea generation approach |
Sosa Silverio, Eduardo |
Master's |
4/15/2010 |
28 |
Optimization of industrial shop scheduling using simulation and fuzzy logic |
Rokni, Sima |
Master's |
1/28/2010 |
29 |
Combined Fuzzy and Probabilistic Simulation for Construction Management |
Sadeghi, Naimeh |
Master's |
10/2/2009 |
30 |
Automation of design and drafting for wood frame structures and construction material waste minimization |
Manrique Mogollon, J. David |
Doctoral |
9/14/2009 |
31 |
Special purpose simulation for tower crane construction operations management |
Appleton, Bradford J. A |
|
32 |
Modeling uncertainty in capital construction projects with lengthy implementation time frames |
Boskers, Nathan David |
|
|
33 |
Improving construction project scheduling through the use of a fuzzy expert system |
Gue, Kevin |
|
|
34 |
Predicting industrial construction productivity using fuzzy expert systems |
Oduba, Ayodele Olugbenga |
|
35 |
A fuzzy logic model for predicting commercial building design cost overruns |
Knight, Karla Grace |
|
|
36 |
Assessment of the annular space in a horizontal directional drilling installation |
Beljan, Ivan J |
|
|
37 |
A fuzzy expert system for design performance prediction and evaluation |
Sun, Zhuo |
|
|
38 |
Descriptive simulation modeling with resource allocation using belief networks |
Tol, Anthony Allan van |
|
|
39 |
Optimization of sewer infrastructure rehabillitation Planning |
MacLeod, Colin W |
|
|
40 |
Simulation-based project control |
Chehayeb, Nader N |
Doctoral |
|
|
|
|
|
|
|
REFRENCE: https://era.library.ualberta.ca |
|
|
|